Service / Infrastructure
Service docks are available at each buidling that assume the need to accommodate 50 foot tractor trailers. The docks are accessed via a dedicated service drive where possible. In a few locations, service is accessed through the parking garage.Phase 1� Centrally located energy plant Consolidated service drivesMaster Plan Controlled Access Points Rear entry service drives
Previous slide | Next slide | Back to first slide | View graphic version |